Capabilities
Construction services
Planning, construction management, scheduling, and project controls from people who actually build. Including 4D planning that links your model to your schedule, so you watch the job before you live it.

The capability
Managed by builders, not binders
Most construction management is paperwork with a markup. Ours comes from a company with its own shop, its own crews, and its own skin in the schedule.
We plan and manage industrial construction scopes end to end: constructability reviews, execution planning, schedule development and maintenance, progress tracking, and project controls that catch slippage while there is still time to act. The people doing it have run fabrication programs, turnarounds, and field crews, so the plans survive contact with the site.
The standout tool is 4D planning. We take your construction model and link it to your Primavera P6 schedule, or whatever scheduling platform you run, and play the project through time. Steel erects on screen in sequence, work fronts open and close, and your turnaround or capital project comes to life before a single crew mobilizes.
That playback changes meetings. Sequence clashes show up as pictures, not surprises. Crews see exactly what their week looks like. Owners watch the lookahead instead of decoding a thousand-line schedule. And when the plan changes, the model replays the new reality in minutes.


Construction services by the numbers
- Services
- Planning, CM, scheduling, project controls
- 4D planning
- Model linked to schedule, played through time
- Scheduling platforms
- Primavera P6, MS Project, others
- Model formats
- IFC and BIM models, SDS/2 exports
- Best fit
- Turnarounds and capital projects
- Data thread
- Detailing, shop status, and schedule in one view
- Reporting
- Visual lookaheads and progress playback
- Coverage
- Shop and field, one team
Why it matters
Why owners bring us the schedule
Watch it before you build it
4D playback runs the job start to finish on screen. Sequence problems, access conflicts, and crane clashes get solved in a meeting room instead of on overtime.
Schedulers who know steel
Our planners came from fabrication and field work. Durations are real, sequences are buildable, and the schedule reflects how iron actually goes up.
One data thread
The model comes from our detailers, fabrication status comes from our shop, and the schedule comes from your planner. Linked together, everyone watches the same truth.
Sectors we serve with this capability
Planning a turnaround or capital project?
Bring the model and the schedule. We will link them and show you the job before the first crane arrives.